Hexavalent Chrome & Xylene Impacted Groundwater treatment by ion exchange and pump and treat |
Clean up of a hotspot of groundwater heavily impacted with a mixture of hexavalent chrome and xylene ahead of redevelopment.
| Client |
URS/Developer |
Consulting Engineer
|
URS |
| Location |
Watford |
| Value |
£130k |
Form of Contract
|
ICE 6th |
Project
Clean up of a hotspot of groundwater heavily impacted with a mixture of hexavalent chrome and xylene ahead of redevelopment. Paint pigment provided visual suggestion of contamination.
Contaminant
Hexavalent chrome and xylene
Challenges
Small footprint treatment area and system capable of handling 2000mg/l chrome and 30mg/l xylene. Solids pre-filtration of microscopic paint pigment particles.
The site was undergoing demolition and general earthworks to prepare the site for redevelopment.The traditional precipitation method for removal of chrome VI would require a large footprint area that would hinder these works.
Technologies employed
|
Treatment unit capable of treating 20 m3/hr
White Karbon
|
|